Sambalpur Local News

Sambalpur: Road Pitch Peeling Off Within Days; Complaints Over Poor Quality Road Construction, Public Demands Administrative Attention

Sambalpur: Ahead of the Sital Sasthi festival, authorities have started repairing and leveling several old roads across Sambalpur. The administration has taken necessary steps to ensure the work is completed in time for the celebrations.

Complaints About Poor Quality

However, many residents have raised serious complaints about the quality of the recent roadwork. Although several roads have already been resurfaced, people claim that the new bitumen (pichu) layer is already peeling off just a day or two after the work was completed.

Example from Daleipada Road

For instance, road repairs were recently done at Daleipada. Yet today, local people noticed that in some parts of the road, the bitumen has already started to come off. They say even light foot pressure is enough to lift the tar surface.

Public Demands Immediate Action

Residents allege that the roads are being built in a hasty and substandard manner. As a result, they are urging the administration to take strict action and ensure proper quality control in the construction process.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Back to top button