Sambalpur Local News

Sambalpur: Water Flow Halted in Power Channel from November 10 to December 20 for Maintenance

Water Flow Suspension in Chipilima Power Channel

Sambalpur: The power station authorities will halt water flow through the power channel to the Chipilima Hydroelectric Power Station from November 10 to December 20. Maintenance crews will perform essential work on the station’s foreway and extended foreway during this period. Workers may discharge water through the auto siphon on occasion.

Notification for Public and Apology for Inconvenience

Odisha Hydro Power Corporation Limited has expressed regret for any inconvenience caused by the water flow suspension and has requested public cooperation to complete the maintenance smoothly.

Water Flow Resumption on December 21

Workers will resume water flow through the power channel from the head regulator to the Chipilima Power Station on December 21 at 6:00 AM or shortly afterward. We advise the public to avoid entering the power channel after December 21, 6:00 AM, as operators will release water.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Back to top button